Client

BAM Construct

Location

Birmingham, UK

Contract duration

24 Months

Contract value

Circa £2.6m

Three Snowhill

Green Frog Mechanical, in November 2018, was awarded the prestigious mechanical installation package by BAM for the Three Snow Hill development.

Ultimately the building would become 420,000 sq ft of Grade A office building located in the heart of the business district in Birmingham city center.

Included within the package was a fully intergraded HDPE above-ground drainage system utilising a cross vent system. 24 floors of bespoke sanitaryware installation alongside domestic pipework supplies to all outlets.

Download PDF

Engineering excellence